If you need more details about our services, you can get in touch by calling or e-mailing us, and we’ll get back to you as soon as possible. Thank you!
Follow us on Social media

Stay up to date with our latest announcements, new services and training courses.

01869 252 600
|
Mon - Fri 08:30 - 17:00
Follow us
Top
MCFP > Automist Installation in a Tree House

Automist Installation in a Tree House

MCFP have recently finished the installation of an Automist Fixed head system for two Tree Houses. This was the third installation MCFP have carried out for Bower House Construction.

“Bower House build traditionally hand-crafted, bespoke & sustainable: tree houses, studios, outdoor spaces and play equipment”

The System is being used as a fire engineered solution enabling the Tree Houses to be used as holiday accommodation.

MCFP Engineer Mark said, “it was a very interesting installation and is a great example of how Automist can be used as a solution to all kinds of building control issues”.

by MCFP
Date

17.04.2019

Services

Automist Fixed head system

Client

Bower House Construction